Official GEOVIA reseller in Indonesia ISO 9001 · ISO 14001
ACALAGeological Expertise, Mining Excellence

Insights · Articles

Mining and geology articles: Surpac, Whittle and MineSched, step by step

Practical notes from ACALA geologists and mine planners on resource estimation, pit optimisation, scheduling, grade control and SNI, KCMI and JORC reporting, with every step shown in GEOVIA software.

Software covered: Surpac Whittle MineSched ACALA Rapid Design

Start here

Four articles that connect the whole workflow, from estimate to schedule and reporting.

  1. Technical guide

    Integrated Mine Planning with GEOVIA Surpac, Whittle and MineSched

    How GEOVIA Surpac, Whittle and MineSched work as one planning chain, from block model and pit optimisation to…

  2. Technical guide

    Kriging vs IDW vs Machine Learning: Which Grade Estimation Method Is More Accurate?

    Studies from 2023 to 2026 compare kriging, IDW and machine learning for grade estimation. ML is not automatically…

  3. Standards & reporting

    Comprehensive Crosswalk Analysis: SNI 4726:2019 Indonesian Mineral Reporting Guidelines vs. JORC Australian Code

    A clause-by-clause comparison of SNI 4726:2019 and JORC: where the two codes agree, where they differ, and what…

  4. Technical guide

    Scoping, PFS and FS: What Each Mining Study Answers, and How Often the Numbers Miss

    Scoping, PFS and FS answer different questions at different accuracy. After the FS, as-built capex averaged 14% over…

Browse by stage

Follow the mining value chain, from the first drillhole to the reserve statement.


  1. Drilling data and geological modelling

    Sampling, QAQC, logging and the 3D geological model.

    7 articles


  2. Resource estimation and geostatistics

    Variograms, anisotropy, kriging, IDW and classification.

    11 articles


  3. Pit optimisation and mine design

    Cut-off grade, dilution, ultimate pit and practical design.

    9 articles


  4. Scheduling and life of mine

    From Whittle strategy to a schedule the fleet can achieve.

    6 articles


  5. Grade control and reconciliation

    Ore and waste decisions in the pit, and proving them afterwards.

    6 articles


  6. Studies and reporting standards

    Scoping to feasibility, SNI 4726:2019 and JORC reporting.

    4 articles

Latest articles

Next step

Have a deposit or pit that needs this work?

Our geologists and mine planners can run the study with you, or train your team to run it in house.