Insights · Articles
Mining and geology articles: Surpac, Whittle and MineSched, step by step
Practical notes from ACALA geologists and mine planners on resource estimation, pit optimisation, scheduling, grade control and SNI, KCMI and JORC reporting, with every step shown in GEOVIA software.
Software covered: Surpac Whittle MineSched ACALA Rapid Design
Start here
Four articles that connect the whole workflow, from estimate to schedule and reporting.
- Technical guide
Integrated Mine Planning with GEOVIA Surpac, Whittle and MineSched
How GEOVIA Surpac, Whittle and MineSched work as one planning chain, from block model and pit optimisation to…
- Technical guide
Kriging vs IDW vs Machine Learning: Which Grade Estimation Method Is More Accurate?
Studies from 2023 to 2026 compare kriging, IDW and machine learning for grade estimation. ML is not automatically…
- Standards & reporting
Comprehensive Crosswalk Analysis: SNI 4726:2019 Indonesian Mineral Reporting Guidelines vs. JORC Australian Code
A clause-by-clause comparison of SNI 4726:2019 and JORC: where the two codes agree, where they differ, and what…
- Technical guide
Scoping, PFS and FS: What Each Mining Study Answers, and How Often the Numbers Miss
Scoping, PFS and FS answer different questions at different accuracy. After the FS, as-built capex averaged 14% over…
Browse by stage
Follow the mining value chain, from the first drillhole to the reserve statement.
Drilling data and geological modelling
Sampling, QAQC, logging and the 3D geological model.
7 articles
Resource estimation and geostatistics
Variograms, anisotropy, kriging, IDW and classification.
11 articles
Pit optimisation and mine design
Cut-off grade, dilution, ultimate pit and practical design.
9 articles
Scheduling and life of mine
From Whittle strategy to a schedule the fleet can achieve.
6 articles
Grade control and reconciliation
Ore and waste decisions in the pit, and proving them afterwards.
6 articles
Studies and reporting standards
Scoping to feasibility, SNI 4726:2019 and JORC reporting.
4 articles
Latest articles
-

Tin Exploration Drilling for PT Timah Tbk in Bangka Belitung, Run on ACALA’s Fleet Management System
ACALA crews drill for PT Timah Tbk in Bangka Belitung with Bangka and Meka rigs, and every hole, metre, delay and cost is recorded…
9 min read -

ACALA Rapid Design for GEOVIA Surpac: Pit, Ramp and Waste Dump in Minutes
How ACALA Rapid Design turns a Surpac block model and design parameters into a practical pit, ramp, waste dump, haul road and landform in…
21 min read -

Scoping, PFS and FS: What Each Mining Study Answers, and How Often the Numbers Miss
Scoping, PFS and FS answer different questions at different accuracy. After the FS, as-built capex averaged 14% over estimate and half of projects missed…
6 min read -

Nickel Laterite: Why IDW Alone Is Not Enough for Resource Estimation
On laterite, IDW and kriging often give similar tonnes. What IDW cannot give is a range, an uncertainty map for the contacts, or a…
6 min read -

Kriging vs IDW vs Machine Learning: Which Grade Estimation Method Is More Accurate?
Studies from 2023 to 2026 compare kriging, IDW and machine learning for grade estimation. ML is not automatically more accurate, validation design decides, and…
6 min read -

Geovia Surpac Geological Modeling Workflow
The GEOVIA Surpac geological modelling workflow end to end: from a validated drillhole database to sections, wireframes and a 3D model of lithology, mineralisation…
6 min read -

Grade Control with Geovia Surpac in Nickel Mining: Why It Matters and What Happens Without It
Why grade control decides what reaches the plant in nickel laterite mining, how GEOVIA Surpac supports it, and what goes wrong when it is…
9 min read -

Applying Internal and External Dilution in a Block Model Using Surpac
How to build internal and external dilution into a Surpac block model, so the resource reflects what will actually be mined at the ore…
7 min read -

Resource Estimation Reblocking vs. Whittle Pit Optimization Reblocking in Nickel Mining: A Detailed Comparative Analysis with Case Study and Surpac Tool Review
Reblocking for resource estimation and reblocking for Whittle pit optimisation serve different purposes. A nickel case study compares both and the Surpac tools used.
10 min read
Next step
Have a deposit or pit that needs this work?
Our geologists and mine planners can run the study with you, or train your team to run it in house.