Articles
GEOVIA Whittle articles
Articles on GEOVIA Whittle: nested pit shells, economic cut-off grade, pushbacks and phase design, ultimate pit selection, and how environmental and closure costs change the optimal pit. Each one links the optimisation back to the block model it starts from. See also GEOVIA Whittle, open pit design and planning and our Whittle courses.
-

Resource Estimation Reblocking vs. Whittle Pit Optimization Reblocking in Nickel Mining: A Detailed Comparative Analysis with Case Study and Surpac Tool Review
Reblocking for resource estimation and reblocking for Whittle pit optimisation serve different purposes. A nickel case study compares both and…
10 min read -

Life-of-Mine Planning with Whittle, Surpac and MineSched: Training with PT Empat Pilar Adidaya
Five days on life-of-mine planning with GEOVIA Whittle, Surpac and MineSched: geological model, pit optimisation, SIMO, pit design and a…
3 min read -

Comprehensive Crosswalk Analysis: SNI 4726:2019 Indonesian Mineral Reporting Guidelines vs. JORC Australian Code
A clause-by-clause comparison of SNI 4726:2019 and JORC: where the two codes agree, where they differ, and what a project…
31 min read -

Comparative Analysis of Cut-Off Grade (COG) Strategies: Australia, Canada, Indonesia, South Africa, and Chile
How cut-off grade is set and reported in Australia, Canada, Indonesia, South Africa and Chile, and why economic and reporting…
9 min read -

Overall Surpac–Whittle Workflow in Practice
The Surpac to Whittle workflow as practised in published case studies: block model and estimate, export, economic and slope parameters,…
12 min read -

Choosing the Ultimate Pit: “Optimize” vs “Maximize” in Open‑Pit Design
How big should the final pit be? The difference between maximising and optimising the ultimate pit, and how the choice…
19 min read -

Integrating Environmental Risk Mitigation Costs into Life‑of‑Mine Planning for Gold Mines
Building environmental risk mitigation and closure costs into the cost structure of a gold life-of-mine plan, and how that changes…
9 min read
Next step
Want this workflow run on your own deposit?
Our geologists and mine planners do the work, and our courses teach your team to do it in house.