Two plans for one cave: the life-of-mine strategy and the schedule that runs it every day.
Block caving and underground mining companies depend on two separate but connected plans: a strategic mine plan covering the whole life of mine, and a detailed tactical plan that turns its decisions into the schedule governing day-to-day operations. Because it is long term, the strategic plan is exposed to internal and external forces: new findings about the orebody, technical advances, changes in the economy or the market. Tactical plans, including the mine schedule, are the calculated short-term response that keeps the mine on its long-term goals. GEOVIA reduces the risk in the first and unlocks the potential of the second, and ACALA brings both to Indonesian underground mines.

The idea
Future-proof both plans: reduce the risk in the strategy and unlock the tactical potential.
To future-proof strategic and tactical plans, block cavers and underground miners must consider every operational scenario and lock in the plans that deliver the full potential, and therefore the maximum value, of the operation.
Swipe sideways to see the whole diagram
Reduce the risk in strategic planning
GEOVIA strategic planning tools simulate geomechanical rock behaviour and determine the optimal mining method, extraction sequence, plant configuration, stockpile and dumping requirements. Risk assessment is built into every step by adding uncontrolled variables, such as noise around traditionally fixed values, so the mine can absorb unforeseen forces.
Swipe sideways to see the whole diagram
Unlock the tactical potential
A central repository where planners collect, collate and update all pertinent data, then advanced blending algorithms choose which blocks are mined when to meet material ratio and quality targets, with virtually unlimited iterations of short- and long-term schedules as conditions change.
Key benefits
What GEOVIA changes for a caving or underground operation.
Fewer surprises
Scenarios that consider price, demand and operating costs, with uncertainty inside the plan, reduce the risk that the strategy is overtaken by events.
Optimised production
Mine-to-mill planning integrated, so bottlenecks are found in the plan and performance improves at the draw point and the plant.
Deeper, safer mining
Geological modelling and geomechanical simulation let miners assess ore at depth, choose method and sequence, and run the operation with fewer geological surprises.
The workflow
From geology model to daily draw order.
The GEOVIA cave planning roles cover the whole chain, from tunnel and draw point layout to the day’s draw order, and hand over to each other without re-entering data.
Geology, geotechnics and the cave footprint
A detailed geological model for accurate resource assessment, with rock behaviour simulated to choose method and footprint.
Tools
- GEOVIA Surpac; Geology Model and Resource Model solutions; geomechanical simulation on the platform.
Result
- A footprint and a method with the risk stated.
Long-term cave plan
Tunnels, draw points and rings set up rapidly; flow modelling and multiple scenarios; superior run-time on full-sized projects.
Tools
- GEOVIA Cave Long-term Planner (GSK); Strategic Mine Planning solution.
Result
- A life-of-mine cave schedule with the undercut sequence.
NPV-optimised production schedule
Schedules that optimise NPV under tonnage, grade and equipment constraints, with realistic undercut sequences in PCBC and exact undercut ring shapes.
Tools
- GEOVIA Cave Mid-term Planner (GTP); Tactical Mine Planning solution.
Result
- Draw bells sequenced with the undercut; a residual block model after analysis.
Draw orders under changing conditions
Schedules kept current, daily draw orders by multiple methods, grade managed from draw point samples, and interfaces to LHD dispatch and monitoring.
Tools
- GEOVIA Cave Operations Scheduler (GPN); Mine Operational Management solution.
Result
- The cave drawn as planned, and the plan updated from what was drawn.
How ACALA helps
Tools, hands or training: how ACALA works with underground mines.
ACALA licenses GEOVIA Surpac, MineSched and the cave planning roles, designs and plans underground mines as a service, and trains planners on their own data.
- SolutionStrategic Mine Planning for CavingFootprint, material flow, geomechanics and scenarios across the life of the cave.
- SolutionTactical Mine Planning for CavingDevelopment and production scheduled together, with cave flow simulation.
- SolutionTactical Mine PlanningThe three cave planning roles and the Tactical Mine Planner.
- SolutionStrategic Mine PlanningMulti-scenario strategy for surface, underground and caving mines.
- ServiceUnderground Mine Design and PlanningDevelopment, stopes and caving designs by ACALA engineers.
- ProductGEOVIA MineSchedDevelopment advance and stope production scheduled together.
- TrainingUnderground planning coursesOn your own mine data.
Reading on this topic
What our planners have written about mine planning.
Other topics
Five more topics, and the four disciplines behind them.
- TopicOpen Pit MiningStrategic and tactical plans for surface mines, from cut-off to pushbacks.
- TopicGeology ModelingAccurate, reliable geology models for mining and civil projects.
- TopicParametric Mine DesignRule-based mine design that regenerates when the data changes.
- TopicMine OperationsGenerate more with less through operations management.
- TopicSustainable MiningLess carbon, water and waste through better planning.
- DisciplinesThe four disciplinesEarth Design · Earth Resources · Geology · Urban Planning
Questions people ask
Block Caving and Underground Mining FAQ
What is meant by underground mining?
What are the four types of mining?
Is underground mining bad for the environment?
What happens in an underground mine?
How does ACALA help?
Next step
Send us the footprint and the block model. We will show you the undercut sequence and what it does to grade.
A working session with an ACALA planner on your own data, then a proposal for licences, planning services or training.