What is mine planning and scheduling software?
Mine planning and scheduling software turns a block model and a mine design into a period-by-period plan: which material is mined, when, with which equipment, and where it goes to meet tonnes, grade and blend targets. In the GEOVIA family, Whittle sets the strategic plan and MineSched builds the tactical schedule from it.
A long-term mine plan answers the question of what to mine over the life of the operation. The site team still has to decide which block, with which fleet, in which week, while it keeps the plant fed at the right grade. GEOVIA MineSched is the scheduling tool in the GEOVIA family built for that job. It turns a pit design and a block model into a period-by-period schedule that engineers can test, explain and update when conditions change.
What GEOVIA MineSched does
MineSched schedules the movement of material from where it sits in the ground to where it has to go. It reads the geological block model and the mine design, typically built in GEOVIA Surpac, and splits the design into mining units such as benches, blocks or strips. Each unit carries its tonnes and grades. The planner then tells MineSched how the mine works:
- Resources and equipment. Which excavators, loaders or drills work where, and at what productivity.
- Dependencies. Which bench must be exposed before the one below it, which stage must open before the next, and how far one face may lead another.
- Destinations. The plant or ROM pad, low-grade and high-grade stockpiles and waste dumps, each with its own capacity.
- Targets. Plant feed tonnes and grade windows, blending rules for several elements, and limits on waste movement per period.
With these rules in place, MineSched builds a schedule that honours the sequence and capacities while it chases the targets. Engineers can see where a target is missed and why.
From strategic plan to tactical schedule
MineSched sits between strategy and execution. A typical GEOVIA workflow looks like this:
- Geological model in Surpac. Drillhole database, wireframes and an estimated block model.
- Pit optimisation in GEOVIA Whittle. Economic pit shells, pushbacks and the long-term mining sequence.
- Practical design in Surpac. Pit stages with ramps, berms and access that equipment can actually work.
- Scheduling in MineSched. Monthly, weekly or daily periods that follow the Whittle strategy within the limits of the real fleet and plant.
Because each step uses the same block model and design data, a change upstream, such as a revised grade model or a redesigned ramp, flows into a new schedule without rebuilding everything by hand. The ACALA article on the Surpac, Whittle and MineSched workflow covers this hand-over in more detail.
Outputs planners and managers use
- Gantt charts of every mining unit and piece of equipment, so clashes and idle time are visible at a glance.
- Period reports of tonnes, grades and volumes by source and destination, ready to export to spreadsheets for budgets and reconciliation.
- 3D animation of the pit and dumps advancing period by period. It is often the fastest way to explain a plan to operations, geology and management in the same meeting.
- Plots and plans of the active faces for each period, which can be issued to the field.
Where MineSched pays off
Grade and blending control
Laterite nickel, bauxite and coal operations often need several elements or qualities held inside narrow windows at the plant or port. MineSched can blend from several faces and stockpiles to meet those windows. It also shows the periods where the ground simply cannot deliver the target. That warning is useful long before it becomes a shipment problem.
Realistic equipment plans
Scheduling against the actual fleet and its productivity exposes plans that look fine on paper but need more machines than the site has. It also shows where a smaller or larger fleet changes the result.
Faster re-planning
When rain, a geotechnical issue or a new drilling result changes the picture, the schedule can be rerun from the same rules instead of being rebuilt in a spreadsheet. Scenarios can be compared side by side before a decision is made.
One version of the plan
Geology, mine planning and operations work from the same model, design and schedule. Fewer copies of the plan circulate, and reconciliation against actual production becomes simpler.
Getting value from MineSched in practice
The software is only as good as the rules it is given. Three habits make the difference on site. Keep the block model and design current. Agree on productivity rates and dependencies with the people who run the equipment. Review the schedule against actual production every period. Teams that learn MineSched on their own project data adopt it much faster than teams that only follow generic exercises. That is how ACALA runs its certified GEOVIA training. The Life-of-Mine plan training case shows MineSched used together with Whittle and Surpac on a nickel project.
Frequently asked questions
Is MineSched only for short-term planning?
No. It is most often used for tactical schedules from weeks to a few years, but the same tool can schedule a full life of mine when the periods are set to quarters or years.
Does MineSched replace Whittle?
No. Whittle decides the economic pit limits and the strategic sequence. MineSched turns that strategy into a schedule the fleet and plant can achieve. The two are designed to work together.
Which commodities can it schedule?
Any commodity that can be described in a block model or a stratigraphic model: metals such as nickel, gold, copper and bauxite, as well as coal and industrial minerals, in open pit and underground operations.
How can we start?
ACALA is an official GEOVIA reseller in Indonesia. We supply MineSched licences, set them up and train your team on your own data. Contact us to discuss a demonstration on your project.


