Official GEOVIA reseller in Indonesia ISO 9001 · ISO 14001
ACALAGeological Expertise, Mining Excellence

Industry Solutions

The workflow is the same. What the deposit does to it is not.

Resource estimation, mine design and scheduling follow the same chain whatever is in the ground. What changes is where the risk sits: a nickel laterite profile is not sampled like a coal seam, a coal seam is not modelled like a vein, and a quarry is not scheduled like an open pit gold mine. This page sets out what ACALA does differently for each deposit type, and which GEOVIA tool and which service the work runs on.

What changes with the deposit

  • SamplingSpacing, support and what a sample actually represents.
  • ModelBlock model, seam model or vein wireframe, and the estimation method that suits it.
  • DilutionWhere waste enters, and how much of it the plan should expect.
  • ScheduleWhat the mine is actually optimising for, tonnes, grade, quality or ratio.
Nickel lateriteA weathering profile: limonite over saprolite over bedrock, grading vertically.
CoalSeams with roof and floor, where quality matters as much as tonnage.
Gold and copperHard rock, where grade continuity and the variogram carry the risk.
TinAlluvial and primary, with recovery tied to how the material is handled.
Iron ore and bauxiteBulk commodities where product specification drives the plan.
QuarryIndustrial minerals and aggregate, planned around a plant that runs every day.

Why it matters

The same estimate, applied to the wrong deposit type, is a wrong estimate.

Sampling that fits the geology

Drill spacing and sample support are decided by how the grade actually varies in that deposit. A spacing that classifies a coal seam as Measured can leave a laterite profile Inferred, and the reverse is just as true.

An estimation method that suits the data

Ordinary kriging, indicator kriging, inverse distance or a seam model each answer a different question. The choice belongs to the deposit, not to habit, and it has to be defensible in the report.

Dilution the plan already expects

Waste enters differently in a vein, a seam and a laterite profile. Dilution modelled at the planning stage is a number the mine can manage; dilution discovered at the plant is a reconciliation problem.

By deposit type

What ACALA does differently for each.

Every line below runs on the same GEOVIA licences and the same team. What differs is the method, and that is the part worth getting right.

1Nickel laterite

A profile that grades vertically

Limonite over saprolite over bedrock, with the boundary between them a grade decision rather than a line in the core.

What we watch

  • Vertical continuity, zone boundaries, block size against bench height, and grade control at the face.

Runs on

  • GEOVIA Surpac for the model, MineSched for the schedule, ACALA grade control training on your own data.
Laterite profile with limonite over saprolite over bedrock, and a Geologist in full PPE at the face
2Coal

Seams, and the quality inside them

Tonnage is only half the answer. Calorific value, ash, sulphur and moisture decide what the tonnage is worth.

What we watch

  • Seam correlation, roof and floor, parting, quality modelling, strip ratio and blending to a product specification.

Runs on

  • GEOVIA Minex for seam modelling and scheduling, with reserves reported to SNI and KCMI.
Coal seams and partings modelled in GEOVIA Minex
3Gold and copper

Hard rock, where continuity is the risk

Grade continuity, the variogram and the top cut carry more of the uncertainty than the drilling density alone.

What we watch

  • Domaining, variography, outlier treatment, classification, and the pit that the grade actually supports.

Runs on

  • GEOVIA Surpac for estimation, Whittle for pit optimisation, ACALA resource estimation and reporting services.
ACALA Geologist logging drill core in the core shed
4Tin, iron ore and bauxite

Bulk and alluvial, planned to a specification

The product the buyer accepts is the target, and the plan works backwards from it.

What we watch

  • Recovery assumptions, product specification, blending across sources, and the haulage the plan depends on.

Runs on

  • GEOVIA Surpac and MineSched, with mining economics and studies where the decision is an investment one.
ACALA Geologists inspecting bauxite on site, both in full PPE
5Quarry

Industrial minerals and aggregate

A plant that runs every day sets the pace, and the pit has to feed it without interruption.

What we watch

  • Short-interval scheduling, face availability, material quality by bench, and the life of the licence area.

Runs on

  • GEOVIA Surpac and MineSched, with open pit design and planning by the ACALA team.
Aerial view of a sand and gravel quarry with its crushing and screening plant

Questions people ask

Industry Solutions FAQ

My deposit is not on this list. Can ACALA still help?
Yes. The list covers the deposit types we are asked about most often in Indonesia. The workflow, the software and the reporting standards are the same; tell us what is in the ground and we will say what changes.
Does the deposit type change which software I need?
Sometimes. Coal seam modelling and scheduling is where Minex is used; hard rock estimation and design sits in Surpac; pit optimisation is Whittle; scheduling is MineSched. Most operations end up with a combination rather than one product.
Which reporting standards apply?
The same ones regardless of commodity: SNI and KCMI in Indonesia, and JORC. What changes with the deposit is the evidence needed to support the classification.
Can our own team do the work instead?
Yes. ACALA works either way: licences, installation and support for your own geologists and planners, or the technical work carried out by the ACALA team on your data.
How do we start?
Send the deposit type, the stage the project is at and what decision is waiting on it. A quote follows within a few working days.

Next step

Tell us what is in the ground, and what decision is waiting on it.

A quote for licences, technical work or training within a few working days.