Official GEOVIA reseller in Indonesia ISO 9001 · ISO 14001
ACALAGeological Expertise, Mining Excellence

ACALA Rapid Design · Part of ACALA Suite for GEOVIA Surpac

ENID

From block model to pit, ramps and waste dump in minutes.

ACALA Rapid Design is an ACALA Suite application built from Surpac TCL macros. It runs inside GEOVIA Surpac as an extra menu and turns your design parameters into a practical pit design, the ramp inside the pit, the waste dump and the ramp up the dump. Every result lands in Surpac as strings and surfaces you can check, edit and keep working on.

Or join the next online group demo, 30 minutes: pick a session in the calendar →

Pit design and haul roads on a nickel laterite deposit designed by Rapid Design, with kerbed junctions
Pit design and haul roads on a nickel laterite deposit, designed by Rapid Design: pit outlines and road edges in navy, road centrelines in red, junctions finished with kerbs. Shaded plan view.
Pit DesignA practical pit straight from the block model: benches, berms and smooth crest and toe lines.
Ramp in the pitA haul ramp on the pit walls, spiral or switchback, sized to your trucks.
Waste DumpWaste placed on the ground in lifts, with berms and the face angle you set.
Ramp on the dumpA ramp to the top of the dump, from the lowest ground or the point you pick.
Haul road and landformThe road from the pit to the dump, and the landform after mining.
PresetsParameter sets saved once and reused, so every design follows the same rules.

Why Rapid Design

Fill in the parameters, press Apply, look at the design.

A first pit, its ramp and a dump for the waste usually take days of digitising, one bench and one corner at a time. Rapid Design builds them from the numbers an engineer already knows, so the days go into comparing designs instead of drawing them.

Minutes, not days

The design is generated in one step. On a nickel laterite block model of 420,000 blocks, the complete pit design and its surface were ready in about two minutes.

Your parameters, every time

Bench height, berm width, face angle, ramp width and grade, lift height, swell factor: the design follows exactly what you enter. Change one number and run again to compare scenarios side by side.

It stays in Surpac

The forms open from the Surpac menu bar and the results are ordinary Surpac strings and surfaces. There is nothing to export or import, and every line can be checked and edited with the tools your team already uses.

Hand-drawn vs parameters

The same pit wall, drawn by hand and designed by Rapid Design.

A pit drawn by hand is digitised one bench and one corner at a time. Each crest and toe is placed by eye, so berm widths and face angles drift from bench to bench, and every change to the block model means drawing the walls again. A first pit, its ramp and a dump usually take days this way.

Rapid Design builds the walls from the numbers an engineer already knows: bench height, face angle and berm width are applied to every bench, and the ramp, the dump and the dump ramp follow the same rules. Change one parameter and run again. On a nickel laterite block model of 420,000 blocks, the complete pit design and its surface were ready in about two minutes.

Schematic section of a pit wall: on the left, benches digitised by hand with face angles from 61 to 72 degrees and berm widths from 2.6 to 5.4 metres; on the right, the same wall designed by ACALA Rapid Design with a bench height of 5 metres, a face angle of 65 degrees and a berm width of 4 metres on every bench
Schematic section of a pit wall. Left: benches digitised by hand, with face angles and berm widths that vary. Right: the same wall from one set of Rapid Design parameters.

Drawn by hand

Crest and toe placed by eye, bench by bench. Widths and angles depend on the drawing, and a new block model means starting again.

ACALA Rapid Design

Bench height, face angle and berm width from the form, on every bench, with smooth crest and toe lines, as ordinary Surpac strings and surfaces.

What changes in practice

Designs in minutes instead of days, scenarios compared side by side, and a design anyone on the team can reproduce from the same preset.

On video

Watch the full workflow, then each module up close.

Recorded in GEOVIA Surpac on a training dataset: a pit from 285,209 target blocks, a 1,990 m ramp from RL 375 to 300 at a mean grade of 3.77 percent, and the final design DTM. Every figure on screen comes from the Surpac log.

Highlight · 73 seconds

From the Rapid Design menu to the block model, Pit Design, Ramp Builder, kerbs at T-junctions, the 3D design DTM and the numbers from the log.

Spotlight: Pit Design

Input, Benches and Shape & Grid tabs, bench geometry, and the pit cut to topography.

Spotlight: Ramp Builder

Ramp Sizing tab, picking start and end points, the route preview and a 3D check.

Spotlight: Roads and kerbs

Junction kerb radius at T-junctions, safety berm and drain, and switchbacks.

The Rapid Design menu in the Surpac menu bar, right after Help, listing Pit Design, Ramp Builder, Waste Dump, Haul Road and Landform Design

Where to find it in Surpac

Once installed, Rapid Design adds its own menu to the Surpac menu bar, right after Help. Pit Design, Ramp Builder, Waste Dump, Haul Road and Landform Design open from there, with Load Preset, Step by Step and Help in the same menu. The toolbar icons next to it open the same forms in one click.

Four designs, one menu

The pit, the ramp in it, the dump and the ramp up the dump.

Each design has its own form. The forms read each other’s results, so the ramp is built on the pit you just designed and the dump is sized for the waste that pit produces.

1Pit Design

A practical pit, straight from the block model

The ore in the block model becomes benches you could set out on the ground, even on a thin, wide nickel laterite deposit.

You set

  • The block model and the topography.
  • Bench height, berm width and face angle.
  • Minimum pit area, and a corner radius for smooth crest and toe lines without jagged corners.

You get

  • Crest, toe and pit outline strings, and the pit surface.
  • A summary of ore, waste and strip ratio for the design.
2Ramp in the pit

A haul ramp that sits on the pit walls

The road from the pit floor to the rim, built to the size of your trucks.

You set

  • Road class or truck width and turning radius, ramp width and maximum grade.
  • Spiral or switchback, and the minimum curve radius.
  • Safety berm, drain, crossfall and curve widening on bends.

You get

  • Ramp centreline and edges, berm and drain strings, and the pit walls adjusted for the road.
  • A preview before you apply it, and the previous design kept if you do not.
3Waste Dump

Waste placed on the ground in lifts

The dump is sized for the waste the pit design produces.

You set

  • The footprint, digitised on screen or read from a string, and the topography.
  • Lift height, berm width, face angle and swell factor.
  • A maximum top RL, or the waste volume to place.

You get

  • Dump design strings and the dump surface.
  • The waste volume read straight from the Pit Design summary, so pit and dump agree.
4Ramp on the dump

A ramp trucks can drive to the top

Access is part of the dump design, not drawn afterwards.

You set

  • Ramp width including the safety berm, and maximum grade.
  • Direction, and spiral with a switchback where the spiral is blocked.

You get

  • An entry point at the lowest ground of the footprint, or the point you pick.
  • The ramp strings included in the dump design.

Also in the menu

The road between them, the land after them, and presets for the rules.

Haul Road

The road from the pit exit to the ramp on the dump, routed around the pit and the dump, with shoulders, drains and cut and fill slopes on both sides.

Landform Design

The shape of the land after mining: terraces, drainage channels and a light vehicle access road for closure and rehabilitation planning.

Presets and step by step

Parameter sets are saved as presets so the next design starts from the same rules, and each stage can also be run step by step when you want to look in between.

In Surpac

Plain forms, design parameters only.

The Rapid Design forms ask for the numbers a mine design is built from, in the units engineers use, and remember the last values you entered.

Rapid Design Pit Design form in Surpac with bench height, berm width and face angle

Pit Design form

Bench height, berm width, face angle and a corner radius for practical, smooth lines.

Rapid Design Ramp Builder form in Surpac with truck size, ramp width and maximum grade

Ramp Builder form

Truck size, ramp width, maximum grade, curve radius, berm and drain, on separate tabs.

Haul road junction with kerbs in a nickel laterite pit design by Rapid Design

Junction with kerbs

Where haul roads meet in the nickel pit, the road edges are joined with 15 m kerb radii at the junction corners.

Rapid Design Waste Dump form in Surpac with swell factor, lift height, berm width and face angle

Waste Dump form

Swell factor, lift height, berm width, face angle and maximum top RL.

Rapid Design Waste Dump ramp tab in Surpac with ramp width, grade and layout

Ramp on the dump

Ramp width with the safety berm, maximum grade, spiral or switchback, entry point.

Waste dump of 12 lifts with berms and its ramp to the top, designed by Rapid Design on real topography

Waste dump with its ramp

Twelve 10 m lifts with 15 m berms and a 20 m ramp to the top at 12 percent, on real topography.

Pit Design on nickel

A nickel laterite pit design in about two minutes, within 0.8 percent of Surpac.

Nickel laterite is thin and spread wide: the ore follows the weathering profile under rolling ground, so the pit is hundreds of shallow pits whose outlines change with every model update. It is the deposit where digitising by hand costs the most, and where Rapid Design saves the most. These are the results on a nickel laterite deposit in Indonesia, modelled in Surpac with 6.25 by 6.25 m blocks only 0.5 m thick.

About 2 minutes

420,686 ore blocks read from the Surpac block model in about 10 seconds; the pit lines ready after 23 seconds; the complete design with bench table and pit surface in about two minutes.

Within 0.8 percent

Ore inside the designed pit: 8.63 million m3 by Rapid Design against 8.56 million m3 in Surpac’s own block model report for the same pit.

250 ha of practical pits

5 m benches, 2.5 m berms and 50 degree faces over 250 ha, crest and toe smoothed to a 10 m corner radius, and pits below the minimum area left out. Strip ratio 1.55 m3 of waste per m3 of ore.

Questions we get

ACALA Rapid Design FAQ

What is ACALA Rapid Design?
An ACALA application built from Surpac TCL macros that runs inside GEOVIA Surpac. It generates a pit design from a block model, the ramp in the pit, the waste dump and the ramp on the dump from the design parameters you enter, and adds a haul road and a landform design.
Do I need GEOVIA Surpac?
Yes. Rapid Design is a menu inside GEOVIA Surpac and works with your Surpac licence. ACALA, an official GEOVIA reseller in Indonesia, can supply both.
Can we edit the designs afterwards?
Yes. The results are standard Surpac strings and surfaces, so every crest, toe, ramp edge and dump lift can be checked and edited with the usual Surpac tools.
Does it replace pit optimisation?
No. Rapid Design turns a block model and your parameters into a practical design quickly. When the question is the economically optimum shell, use GEOVIA Whittle; Rapid Design is for fast designs and for comparing scenarios.
How accurate are the volumes?
On a nickel laterite block model, the ore volume inside the Rapid Design pit was 8.63 million m3 against 8.56 million m3 in Surpac’s own block model report for the same pit, a difference of 0.8 percent.
How do we get it?
Contact ACALA on WhatsApp or through the contact form. We show Rapid Design on your own block model and topography, then install the menu in your Surpac and train your team to use it.

Next step

Bring a block model and a topography. We will design the pit, its ramp and the dump with you.

A session on your own data in Surpac is the fastest way to see how much drawing time Rapid Design takes off your engineers.