Mining Studies · Strategic and practical, with collaborative expertise
ENID
Mining studies from preliminary assessment to feasibility, written by people who have built and run the mines.
Whether you are conducting a preliminary assessment or advancing toward feasibility, ACALA’s geologists and mining engineers deliver high-quality mining studies. With a strong track record in feasibility study management, experience constructing and operating open pit and underground mines, and years of hands-on operational insight, we take a strategic yet practical approach to the economics of a project, tailoring methods to your objectives and identifying the levers that maximise value within the constraints.
Download the Mining Engineering & Studies capability statement (PDF, 2 pages, 540 KB)
Why ACALA
Studies are dynamic. We manage the variables so the outcome stays clear.
Mining studies are shaped by evolving input parameters. ACALA proactively assesses when key parameters need to be revisited to keep the outcome accurate, and our mining engineers manage those variables in a structured manner, maintaining clarity throughout the investigation.
Operators, not only analysts
Experience constructing and operating open pit and underground mines, so the study describes a mine that can be built and run, not only one that models well.
Collaborative by design
A consultative approach that builds lasting client relationships, working closely with other professionals inside ACALA and externally when needed, so every study team delivers a comprehensive result.
Benchmarked economics
ACALA’s proprietary database of international benchmarks compares the project against industry standards, revealing cost competitiveness, productivity gaps and upside for smarter capital allocation.
ACALA services offered
Eight services, from the first assessment to an integrated study team.
- 1
Preliminary and scoping assessments
Order-of-magnitude economics and option screening to decide whether and how to advance.
- 2
Feasibility study
Pre-feasibility and feasibility studies managed end to end, to the standard lenders and exchanges expect.
- 3
Mine design and planning
Open pit and underground designs and schedules that the study’s economics rest on.
- 4
Operational benchmarking and cost analysis
Costs and productivities compared against ACALA’s international benchmark database.
- 5
Resource and reserve reporting
Public reporting under SNI, KCMI and JORC, signed by Competent Persons.
- 6
Financial and economic modelling
Technical economic models with the sensitivities that show which inputs matter.
- 7
Independent project valuation and model audits
Verification of third-party studies and models for due diligence.
- 8
Collaborative study team integration
ACALA specialists embedded in your study team, or your specialists in ours.


One team behind the study
Geology, engineering and economics from the same office, in the same software.
The resource estimate, the mine design, the schedule and the economic model are produced by ACALA’s own geologists, engineers and analysts in GEOVIA Surpac, Whittle and MineSched, so the study’s chapters agree with each other and the files stay usable after the study.
- ServiceResource EstimateThe resource chapter, classified for the study stage.
- ServiceOpen Pit Mine Design and PlanningDesign, reserves and life-of-mine plan.
- ServiceMining EconomicsThe technical economic model and benchmarks.
- ServiceMineral Asset ValuationWhen the study feeds a transaction or a listing.
- SoftwareGEOVIA WhittleStrategic options and pit limits across scenarios.
Reading
Articles on studies and reporting
Questions we get
Mining studies FAQ
Which study do we need first?
Can ACALA manage the whole study, including other consultants?
Will the study be accepted by banks and exchanges?
How long does a study take?
What do we receive?
Next step
Your project deserves clarity and confidence. Tell us which decision the study must support.
A scoping call with a study manager, then a written proposal with scope, disciplines, data request and schedule.