Mining studies from preliminary assessment to feasibility, written by people who have built and run the mines.

Whether you are conducting a preliminary assessment or advancing toward feasibility, ACALA’s geologists and mining engineers deliver high-quality mining studies. With a strong track record in feasibility study management, experience constructing and operating open pit and underground mines, and years of hands-on operational insight, we take a strategic yet practical approach to the economics of a project, tailoring methods to your objectives and identifying the levers that maximise value within the constraints.

Study stages and estimate accuracy: the typical accuracy band of capital and operating cost estimates narrows from scoping through pre-feasibility to feasibility −50%estimate+50% −35%+35% Scoping study · cost accuracy about ±35% · Inferred resources allowed Purpose: is the project worth studying further? Options screened, no reserves declared.
Each stage narrows the accuracy of the estimate and raises the confidence required of the resource. Typical bands under the international reporting codes. Drag the handle: scoping, pre-feasibility, feasibility.
Scoping studyOrder-of-magnitude economics to decide whether to keep going.
Pre-feasibilityOptions compared and the preferred case selected; first reserves.
FeasibilityThe case a bank or board can commit capital against.
Study managementParameters, disciplines and schedule managed so the study lands.
BenchmarksProject economics compared against ACALA’s international database.
CodesSNI, KCMI and JORC for resources, reserves and reporting.

Why ACALA

Studies are dynamic. We manage the variables so the outcome stays clear.

Mining studies are shaped by evolving input parameters. ACALA proactively assesses when key parameters need to be revisited to keep the outcome accurate, and our mining engineers manage those variables in a structured manner, maintaining clarity throughout the investigation.

A study passing three checks, models well, can be built and can be run, with the last two supplied by experience constructing and operating open pit and underground minesIT MUST ALSO BE BUILDABLEmodels wellcan be builtcan be runthe studyopen pitundergroundACALA has built and run them, not only modelled them

Operators, not only analysts

Experience constructing and operating open pit and underground mines, so the study describes a mine that can be built and run, not only one that models well.

Geology, mine planning and economics inside ACALA forming one study team, with external help joined by a dashed link when needed, above a line marking several studies for the same clientONE TEAM AROUND THE STUDYgeologymine planningeconomicsone studyteamexternal helpwhen neededLASTING CLIENT RELATIONSHIPSone relationship, several studies

Collaborative by design

A consultative approach that builds lasting client relationships, working closely with other professionals inside ACALA and externally when needed, so every study team delivers a comprehensive result.

Unit cost, productivity and upside each plotted as the project position inside the international benchmark set, with the middle half of the set shaded and the median markedAGAINST THE BENCHMARK SETposition in the international setunit costproductivityupsidethis projectmiddle half of the setread together for smarter capital allocation

Benchmarked economics

ACALA’s proprietary database of international benchmarks compares the project against industry standards, revealing cost competitiveness, productivity gaps and upside for smarter capital allocation.

ACALA services offered

Eight services, from the first assessment to an integrated study team.

  1. 1

    Preliminary and scoping assessments

    Order-of-magnitude economics and option screening to decide whether and how to advance.

  2. 2

    Feasibility study

    Pre-feasibility and feasibility studies managed end to end, to the standard lenders and exchanges expect.

  3. 3

    Mine design and planning

    Open pit and underground designs and schedules that the study’s economics rest on.

  4. 4

    Operational benchmarking and cost analysis

    Costs and productivities compared against ACALA’s international benchmark database.

  5. 5

    Resource and reserve reporting

    Public reporting under SNI, KCMI and JORC, signed by Competent Persons.

  6. 6

    Financial and economic modelling

    Technical economic models with the sensitivities that show which inputs matter.

  7. 7

    Independent project valuation and model audits

    Verification of third-party studies and models for due diligence.

  8. 8

    Collaborative study team integration

    ACALA specialists embedded in your study team, or your specialists in ours.

ACALA mining engineers working on a study
From assessment to feasibility: operational insight, structured collaboration, tailored strategy.
Pit design in GEOVIA Surpac used in a mining study
The study is built on the geological model and the mine plan behind it.

One team behind the study

Geology, engineering and economics from the same office, in the same software.

The resource estimate, the mine design, the schedule and the economic model are produced by ACALA’s own geologists, engineers and analysts in GEOVIA Surpac, Whittle and MineSched, so the study’s chapters agree with each other and the files stay usable after the study.

Questions we get

Mining studies FAQ

Which study do we need first?
A scoping study if the question is whether the project deserves more money. A pre-feasibility study if options must be compared and a preferred case chosen. A feasibility study when a board or a lender must commit capital.
Can ACALA manage the whole study, including other consultants?
Yes. Feasibility study management is a core skill, and collaborative study team integration lets ACALA lead, join or coordinate with external specialists such as metallurgists and environmental consultants.
Will the study be accepted by banks and exchanges?
Studies are prepared with resources and reserves reported under SNI, KCMI and JORC and signed by Competent Persons, which is what listings and project finance require.
How long does a study take?
A scoping study is typically weeks; a feasibility study is months and depends on the drilling, metallurgical test work and permitting inputs available. The schedule is set with the scope, after the data request is answered.
What do we receive?
The study report with its chapters and appendices, the technical economic model, and the geological models, designs and schedules in GEOVIA formats your team can keep using.

Next step

Your project deserves clarity and confidence. Tell us which decision the study must support.

A scoping call with a study manager, then a written proposal with scope, disciplines, data request and schedule.