Solution · Operation
Operation solutions: the plan and the mine reading the same numbers, every day.
Once the mine is running, the question changes from what should happen to what is happening. The Operation phase has one solution today, Mine Operational Management, which connects production, the block model and the budget in one database so that engineers, geologists and planners stop exchanging spreadsheets and start reconciling. It leans on the Tactical Mine Planning solution for the short-term schedule, on GEOVIA Surpac and MineSched for the work, and on ACALA for grade control, reconciliation and the change itself.

One solution and what it works with
Manage the operation from one set of numbers.
The solution page explains the problem of disconnected data and the four-step loop that replaces it. The cards beside it are the solution, product and service it works with.
SolutionMine Operational Management
Production, block model and forecast data in one place instead of email attachments, so engineers, geologists and planners work from the same numbers.
Related solutionTactical Mine Planning
The monthly and weekly schedule that operational data keeps current.
ProductGEOVIA MineSched
Short-term schedules read directly from the updated model and design, published to Excel and Project.
ServicePlanning and Optimization
ACALA planners and geologists at the operation: grade control, reconciliation, re-planning.
How the phase runs
The operational loop: capture, integrate, reconcile, re-plan.
Each turn of the loop makes the block model, the schedule and the budget a little closer to the mine.
Record the day where the model can read it
Survey, production, grade control and dispatch data in one database.
Tools
- Surpac survey, volumes and grade control; dispatch and plant feed loaded to the same database.
Outcome
- Actual tonnes and grade per source per period.
One model and one plan for every department
The block model, designs and schedule on the platform with access rights.
Tools
- 3DEXPERIENCE with Collaborative Designer for Surpac and the referential manager.
Outcome
- Everyone reads the same objects, live, with an audit trail.
Model to mine, plan to plant
What was predicted, what was scheduled and what the plant received, compared and explained.
Tools and service
- Surpac reconciliation by block, bench and period; stockpile balances.
- ACALA grade control and reconciliation services.
Outcome
- Reconciliation factors that point to the cause.
Update the schedule from actuals
The tactical schedule and the budget forecast refreshed weekly.
Tools
- MineSched scenarios from the updated model and design; Tactical Mine Planner role.
Outcome
- A plan the operation recognises, and a budget that tracks it.
Behind the solutions
Surpac and MineSched for the loop, the platform for the sharing, ACALA for the change.
ACALA licenses the tools, designs the data flow with your engineers and geologists, runs reconciliation and grade control, and trains the people who keep the loop turning.
- SolutionMine Operational ManagementThe full four-step loop.
- ProductGEOVIA SurpacSurvey, grade control, volumes, reconciliation.
- ProductGEOVIA MineSchedShort-term schedules from actuals.
- ProductFleet Management SystemDispatch, unit time and cost recorded as the shift happens.
- ServicePlanning and OptimizationACALA at the operation.
- Previous phasePlanningThe plan the operation follows.
Reading
Articles on reconciliation and grade control
Questions we get
Operation solutions FAQ
Why only one solution in this phase?
We only have Surpac. Where do we start?
What is reconciled, exactly?
Can dispatch and fleet data be included?
How does ACALA help?
Next step
Show us how production, the block model and the budget are shared today. We will map the loop that replaces the copies.
A half-day review with an ACALA engineer at the operation or online, then a proposal for tools, services and training.