Official GEOVIA reseller in Indonesia ISO 9001 · ISO 14001
ACALAGeological Expertise, Mining Excellence

Solution · Planning

Planning solutions: governed data, an optimised strategy, an engineered design and a schedule the mine can follow.

Planning is where the resource becomes a business. Four solutions cover it in order: Geodata Discovery governs the geoscience data every planner reads; Strategic Mine Planning finds the pit, phases, capacity and cut-off that maximise value and tests them against price; Mine Design engineers the pit, ramps and dumps as one parametric model; Tactical Mine Planning turns the life of mine plan into monthly and weekly schedules. Behind them: GEOVIA Whittle, Surpac and MineSched, the 3DEXPERIENCE planning roles, and ACALA design, planning, economics and study services.

Mining cycle selector: seven solutions arranged by exploration, planning and operation, with the solutions for the chosen phase highlighted Planning · 4 solutions Geodata Discovery → Strategic Planning → Mine Design → Tactical Planning Question: what is it worth, and how do we mine it?
This hub covers the planning phase, highlighted. Move the handle to see the neighbouring phases and how the solutions hand over. Drag the handle: exploration, planning, operation.
ReferentialThe governed set of geoscience data the whole project refers to.
Hill of ValueNPV mapped over cut-off and capacity, so every scenario is visible at once.
Practical phasesPushbacks with real mining widths, not just nested shells.
Parametric designPit, ramps and dumps as one model that updates when a parameter changes.
Target schedulingSources chosen per period to meet grade, ratio and quality targets.
AssociativityA change in the model or design flows through to the plan and its economics.
Surface Mine Designer: parametric pit design
Strategy, design and schedule, on one model. Image from the GEOVIA brochure distributed by ACALA.

How the phase runs

Four steps from resource to schedule.

The order matters: strategy before design, design before schedule, and one governed dataset under all three.

1Data

Govern the geoscience data

One referential with semantics and access rights, Surpac connected natively.

Solution

  • Geodata Discovery: Geoscience Referential Manager, Collaborative Designer for Surpac, data integrators.

Result

  • Every planner reads the same model, live.
2Strategy

Optimise pit, phases, capacity and cut-off

Multi-scenario analysis with price uncertainty, on the Hill of Value.

Solution and service

  • Strategic Mine Planning: Pit Optimizer and Strategic Mine Planner roles; GEOVIA Whittle.
  • ACALA Mining Economics and Mining Studies.

Result

  • A life of mine plan with the sensitivity that shows how firm it is.
3Design

Engineer the pit, ramps and dumps

Parametric design against the geology, the geotechnical limits and the strategic phases.

Solution and service

  • Mine Design: Mine Designer roles on 3DEXPERIENCE and Surpac.
  • ACALA Open Pit and Underground Mine Design services.

Result

  • Designs that can be re-run when a parameter changes.
4Schedule

Sequence the next months and weeks

Practical schedules with rules, capacities, stockpiles, blending and haulage.

Solution and service

  • Tactical Mine Planning: Tactical Mine Planner and cave planning roles; GEOVIA MineSched.
  • ACALA Planning and Optimization.

Result

  • A schedule the operation can follow, and the inputs for the Operation phase.

Behind the solutions

Whittle, Surpac and MineSched for the work, the platform for the data, ACALA for the studies.

ACALA licenses the products and roles, runs pit optimisation, design, economics and study work for owners and investors, and trains planning teams.

Questions we get

Planning solutions FAQ

Do we need all four solutions?
No. Most operations start with strategy and schedule on Whittle, Surpac and MineSched. Geodata Discovery and the platform roles come when several departments need the same objects live.
What is the difference between strategic and tactical planning?
Strategic planning chooses the pit, phases, capacity and cut-off over the life of mine. Tactical planning sequences the next weeks and months inside that plan, with real equipment and blend targets.
Where does Mine Design sit?
Between strategy and schedule. The optimised phases become an engineered pit with ramps and dumps, and the schedule is built on that design.
Can ACALA do the planning for us?
Yes. ACALA runs pit optimisation, mine design, scheduling, economics and studies as services, and trains your team to take them over.
How does ACALA help?
Licences for Whittle, Surpac, MineSched and the 3DEXPERIENCE planning roles, planning and study services, and training on your own data.

Next step

Send us the block model. We will show you the Hill of Value, a first design and a first schedule.

A working session with an ACALA planner on your own data, then a proposal for licences, services or training.