Surpac tip – How to see the distance between drilling and planned underground workings

Discover in this video how to calculate distances from existing drillholes to planned underground workings.
When to use this
Old exploration and grade control holes that pass close to planned drives or stopes can carry water, gas or blast pressure into the workings. Knowing the distance from each hole to the planned openings lets planners set standoff distances, arrange grouting or probe drilling where needed, and warn crews in advance.
The same distance information helps geologists see which holes inform a planned stope, and whether more drilling is needed before development reaches an area. Running the distance check early in design leaves time to change a drive alignment or plan grouting, instead of discovering a nearby hole when development is already close.
Practical checks
- Confirm collar and downhole survey data are complete, since holes without surveys will plot in the wrong place.
- Use the latest approved design solids and record which version was checked.
- Make sure the drillhole database and the designs use the same coordinate system and elevation datum.
- Measure a few of the reported distances manually in section to confirm the results.
Related at ACALA
Read more about GEOVIA Surpac for underground design and drillhole work. ACALA also supports drillhole data through its resource estimate service and runs GEOVIA training.
Next step
Want your team to work this way every day?
Our courses teach these workflows in GEOVIA Surpac, Whittle and MineSched, and our support team answers the questions that come up afterwards.