Surpac tip – Splitting trisolations in GEOVIA Surpac v6.8

Today’s blog guides users on how to make use of the GEOVIA Surpac Surface Validation feature which can be used to split trisolations and which was introduced in Surpac v6.8.
When Surfaces files are extracted from external software packages they often have multiple surfaces with one trisolation number and one object number. This is true for *.dxf files exported out of GEOVIA Whittle and other packages. Multiple trisolations with one trisolation number and object number are considered invalid in Surpac and therefore cannot be used to perform any surface functions such as Volumetrics reporting or contouring.
The Auto Surface Repair (Automatic mesh repair) tool allows the user to split all connected trisolations into multiple trisolations. Here’s how:
Open a file (e.g. duc25.dxf) with the connected trisolations. The example file opened below is from Whittle exported shells which shows multiple connected trisolations all with trisolation number 1.

The surface validation shows that the DTM is invalid.

For this file to be used, the trisolations have to be split.
Use function Surfaces| Validation| Auto Surface Repair

Complete the dialog as follows (select the trisolation open in the Graphics)

Trisolations will be split into multiple trisolations and validated.


The validated surface file may be saved with a new name or existing name (e.g. duc25_validated.dtm/str)
When to use this
Invalid surfaces usually appear when data comes from outside Surpac: optimisation shells, CAD drawings or survey contractor files. Until they are valid, volume reports and contours either fail or give misleading numbers, which is easy to miss when the surface looks correct on screen.
Making validation and repair a standard step in your import routine prevents those errors from reaching designs and reports. It is particularly worth doing when a batch of shells is imported to compare pit options. A repaired, validated surface can then be used with confidence in later steps such as pit design, volume reporting or comparison between optimisation scenarios.
Practical checks
- Run surface validation right after import and again after repair, and keep a note of the results.
- Compare the extents and the number of trisolations before and after the repair to confirm nothing was lost.
- Store the original imported file in a source folder so the repair can be repeated if needed.
- Cut a section through the repaired surface and compare it visually with the original.
Related at ACALA
Learn more about GEOVIA Surpac and GEOVIA Whittle. ACALA uses the same checks in its open pit mine design and planning service.