MineSched
Scheduling, haul roads, rimpull tables and schedule animation in GEOVIA MineSched.
MineSched 2022 Refresh 2 Scheduling Tip
MineSched has always led the market with its long-term scheduling abilities. This is due to the fact that it was developed with long-term tactical…
MineSched tip – Copying Graphics for presentations
A visual representation of mine plans and schedules is often required for presentations and reporting purposes, and it’s simple to do so in GEOVIA MineSched.
MineSched tip – Animate MineSched schedules with blocks colored by material class
How to communicate efficiently on the different materials that are being mined in every period ? what about the ones being exposed in each…
MineSched tip – How to embed MineSched Schedule Animation into 3DEXPERIENCE platform 3DPlay
With GEOVIA MineSched 2020’s new capability, MineSched POWER’BY enables you to upload the results of a MineSched schedule to the 3DEXPERIENCE platform to analyze and…
MineSched tip – How to get optimum results out of the trucks calculation
Defining haul truck speed for a haul road is an important step to calculate the number of trucks required to mine the required tonnes…
MineSched tip – How to incorporate existing production schedule with LOM Study
A common practice for Tactical Mine Planners is to do the Life of Mine Plan and break it into short-medium term schedule. However, there…
MineSched tip – update Haul Roads that have been adjusted in Surpac (GMP)
Following the creation of Haul routes and running the schedule to get the results in MineSched, if you want to modify haul road strings…
MineSched tip – Part 2: Using Rimpull Table
This post explains the steps for using Retard tables with empty trucks in GEOVIA MineSched, continuing from the previous discussion on Rimpull tables. It…
MineSched tip – Part 1: Using Rimpull Tables
This blog aims to provide MineSched users with a background on Rimpull/Retard tables and explaining how they are used in MineSched 9.2.The CAT 973D…
MineSched tip – Improving Accuracy with Partial Percentages
It is important for mine planners to report numbers that are as accurate as possible when generating mining schedules. GEOVIA MineSched, as a planning…
MineSched tip – Displaying a Block Model
Mining engineers may want to visualize block models inside GEOVIA MineSched to both orient and understand their schedule better. This will allow them to better relate…
MineSched tip – Importing Haul Route Names into GEOVIA MineSched
Tracking haul routes in mine planning can be complex, especially with multiple destinations like dumps, ROM, and TSF. The latest version of MineSched simplifies…
Looking for longer reads on method, geostatistics and reporting standards? Browse the Articles.
Next step
Want your team to work this way every day?
Our courses teach these workflows in GEOVIA Surpac, Whittle and MineSched, and our support team answers the questions that come up afterwards.
