All Surpac tips
Surpac tip – File conversion from Latitude and Longitude to a grid reference system to enable use in Surpac
Sometimes data is provided in CSV format from other packages that contain Latitude and Longitude information. To ensure this data to be seen and…
Surpac tip – Creating dump block models in Surpac to use in MineSched
In MineSched we can sequence the deposits (fill locations). Fill locations are fixed volumes and defined by block model, which are the final destination…
Surpac Tip – Designing ramps with varying slope angle and berm width
In pit design, engineers often need to adjust slope angles and berm widths based on rock stability. GEOVIA Surpac supports this by using values…
Surpac Tip – Pit Design, top to bottom
Mining/Design Engineers often need to design pits from a top boundary with varying RL values, while subsequent benches require fixed RL designs with ramps.…
Surpac tip – Meshing point clouds faster
Point cloud processing in Surpac, available since version 6.8, continues to advance and handle increasingly large datasets, such as a 4GB file with 155…
Surpac tip – Creating grayscale colour DTM surface model from RGB point cloud
Surpac makes mining data visualization smarter! Transform RGB point clouds into practical greyscale surface models, and with Surpac 6.8’s .OBJ support, bring textured meshes…
Surpac tip – Contouring Soil Assay Results Using DTM Method
As geologists, we commonly work with contoured images. These may be created from soil samples, topography, base of oxidation and so on. By contouring…
Surpac tip – Contouring Soil Assay Results Using Grid Method
In this post, we explore an alternative method to contour assay results in GEOVIA Surpac – using gridding and interpolation to create a contoured…
Surpac tip – Splitting trisolations in GEOVIA Surpac v6.8
Today’s blog guides users on how to make use of the GEOVIA Surpac Surface Validation feature which can be used to split trisolations and…
Surpac tip – Converting historical 2D plans into Surpac 3DM solids
In many projects, mining technical teams need to interpret 2D plan data to create useable 3D solids that accurately represent the interpretation of the…
Surpac tip – How to see the distance between drilling and planned underground workings
Discover in this video how to calculate distances from existing drillholes to planned underground workings.
Next step
Want your team to work this way every day?
Our courses teach these workflows in GEOVIA Surpac, Whittle and MineSched, and our support team answers the questions that come up afterwards.











