Whittle tip – How to merge Block Models
In today’s post I will answer a common question raised in GEOVIA Whittle – How to merge two or more block models into a single framework?
Originally shared on the GEOVIA user community by Shoaib ZIA. Adapted and republished by ACALA for Indonesian users.

In today’s post I will answer a common question raised in GEOVIA Whittle – How to merge two or more block models into a single framework?
This task is often utilized in pit optimization workflows to merge two or more block models, for example if ore from two/more different locations goes to the same process plant.

- First of all import your block models separately in to GEOVIA Whittle as normal to generate *.MOD and *.PAR files or use Surpac export option to Whittle
• Make sure that both block models have the same block size or re-block them in GEOVIA Whittle
• Invoke the function from Tools > Merge Models

Select the required *MOD and *PAR files and fill the required field

Select the “adjust frame work tab” to make sure that there is no “Model Lost”

Check the box “Import on completion”, it is also possible to import the files later using Import options in Whittle
Use “Check Data” box to make sure that data is valid

Make sure in next tabs that all the parameters are correct.
After the completion of import, both block models will be merged in to single block model and the optimization workflow can be imitated.

Do not forget to validate the numbers against the original block models before running optimisation and scheduling. You can use Whittle LOM scheduling tools to create strategic schedule using one of available scheduling algorithms. It is required to have Multi-Mine module to run this function.

When to use this
Merging models is the right step when two or more deposits share one processing plant. Optimising each pit on its own ignores the fact that they compete for the same plant capacity, so the combined result can be unrealistic. With all sources in one framework, the optimisation and schedule can weigh which material is worth sending to the plant first.
It also makes scenario work easier. Questions such as which deposit to start with, or how a satellite pit changes the overall value, can be tested in a single project instead of being stitched together from separate runs.
Practical checks
- Record tonnage and metal by material type for each source model before merging, so the merged totals can be reconciled against them.
- Confirm that all models use the same coordinate system and length units, and that their origins line up with the common block size.
- Check that rock type and material codes do not clash; a code used for different materials in two models will be combined incorrectly.
- Keep the original MOD and PAR files untouched in a separate folder so the merge can be repeated if a source model changes.
Related at ACALA
Learn more about GEOVIA Whittle for pit optimisation, or about block model export from GEOVIA Surpac. For multi-pit studies, ACALA offers a planning and optimization service.
Next step
Want your team to work this way every day?
Our courses teach these workflows in GEOVIA Surpac, Whittle and MineSched, and our support team answers the questions that come up afterwards.